This project is read-only.

Was there a limit in updating task data. Timesheet not shown if the team updated more than 150 records.

Since the timesheet for myProjects was not opened and thrown exception TF400898: An Internal Error Occurred. Checked on a particular date there were 194 tasks updated. Is there a limitation of upd...

Id #12434 | Release: None | Updated: Nov 22, 2016 at 6:38 AM by techgroup | Created: Nov 22, 2016 at 6:38 AM by techgroup

Installer not working on Windows 8?

I've used the v1 version of this control with VS2010 for years with great success. I've tried to install v2 on multiple pcs running Win8.1 with VS2012 installed and the installer throws an unexpec...

Id #11867 | Release: None | Updated: Sep 17, 2014 at 11:00 PM by tklooster | Created: Sep 17, 2014 at 11:00 PM by tklooster

2.0.1.0 Disappears after updates installed

After install update 1,2,3 i need to reinstall

Id #11112 | Release: None | Updated: Nov 12, 2013 at 9:21 AM by bhsrpt | Created: Jun 28, 2013 at 5:39 PM by cromwellryan

VS 2010 Crashes when clicking Add; Cannot see time entries until restart

When I click the Timesheet Tab, I cannot see past entries of time added on work items. If I click Add to enter time on a Work Item, VisualStudio crashes. I then re-start VS and I can see previous e...

Id #11052 | Release: None | Updated: May 31, 2013 at 7:38 PM by jvcodeplex | Created: May 31, 2013 at 7:38 PM by jvcodeplex

Time Entered in Bug WIT Randomly Spawning to other Bug WIs'

We have been using this solution on Task WIT's for quite some time. We just recently added it to the Bug WIT and are experiencing an oddity with time entered on one Bug spawning (exact copy) to ano...

Id #10805 | Release: None | Updated: Feb 14, 2013 at 9:32 PM by ISutherland | Created: Feb 8, 2013 at 4:17 PM by ISutherland

Users need ability to enter more than 8 hours per task per day

Very frequently, our staff works longer than 8 hours on a given task in a single day. The current restriction of 8 hours per task per day does not allow us to capture data accurately. It would be...

Id #10394 | Release: None | Updated: Mar 14, 2013 at 1:09 PM by mollwe | Created: Aug 6, 2012 at 7:01 PM by bhibbeler

Add dates to 'week' entries

Whilst browsing through the tree in the report view for TFS Timesheets, weeks are shown by number. Now, call me stupid, but 'Week 37' doesn't mean much to me, and I'd prefer something along the lin...

Id #9541 | Release: None | Updated: Feb 14, 2013 at 9:32 PM by ISutherland | Created: Nov 11, 2011 at 11:01 AM by rarmour

TFS Timesheet Report enhancement

Would it be possible to annotate the 'Week 29' type labels with a date, something along the lines of 'Week 29 - w/c 18/07/2011', as this would prevent the user from having to randomly open various ...

Id #8978 | Release: None | Updated: Feb 14, 2013 at 9:32 PM by ISutherland | Created: Jul 21, 2011 at 1:08 PM by rarmour

Failure to setup Timesheet Work Item control

I get the following error when setting up the control. In the instructions it indicates in needs to be "plaintext" but it seems to be coded as "string" can you help?   TF26038: Field type for Custo...

Id #8936 | Release: None | Updated: Feb 14, 2013 at 9:32 PM by selnahwy | Created: Jul 13, 2011 at 11:45 PM by selnahwy

Investigate building query (from Richard) into a view on the portal

Thinking that this could either be done as an SSRS report, or an Excel report within the portal.     Hi Nick,   Just wanted to reiterate what Steve said about this being an excellent control. I hav...

Id #8657 | Release: None | Updated: Feb 14, 2013 at 9:32 PM by nickhoggard | Created: May 24, 2011 at 7:38 PM by nickhoggard